Next, it goes to the structure.
First you're putting everything in the lot. We wanted an easy
Achieve gradient. First the top layer of the lawn off
We were at the right level.
Tip
This is a tough job.
In any case for me.
This meant with us, all paving stones away, collect the grit
the Strip drainage concrete way banging and the humus pay up
the level agreed.

That was the anstrengenste.
A street fleece was then placed on the Earth.
Is supposed
prevent Grünzeugs into the Earth roots.
The split came on the fleece. Thus, the level was judged very roughly.
It turned out but you can do it only exactly
When the substructure.
The paving stones were then placed on the concrete and the split.
The paving stones prevent that the substructure directly on the
Ground is located. So is a lot of air between the wood and the floor.
Also gave us the paving stones, the roof height and
the upper design just the right height to flush with the
To be doors.